CSD Instruments
Battery Loading Unit

Engineered in India

Put Backup Power
to the Test.

Draws a controlled discharge at real substation current to prove what a bank can actually deliver.

About the instrument

Built around the
work on site.

A discharge test needs a carefully planned load, duration and stopping procedure. Contact CSD with your bank configuration and test requirements to discuss equipment selection and the arrangements needed on site.

Contact Us

Load bank

01

A battery can look healthy and still fail under load. The loading unit draws a steady, controlled current to show what the bank can really deliver.

02

The discharge is held constant and timed, so the result is a true measure of capacity rather than an estimate.

03

Draws a controlled discharge at real substation current to prove what a bank can actually deliver. The final configuration, accessories and operating method should be reviewed against the actual application and site procedures.

Battery testing inside a substation

Designed for the conditions where the measurement happens.

Battery Loading Unit

Load bank

Battery Loading Unit

01

Real load

Proves true capacity

02

Controlled

Steady, timed discharge

03

Safe operation

Protected against over-discharge